To sum up my day, it all started when I arrived at my cabinet install job in Dewey. I mistakenly backed up my 2007 Ford van 🚐 onto loose gravel in Doug’s driveway and got stuck. It took me 90 minutes to get it back on the pavement & now I have some landscaping clean-up to do 😒.
The job at hand today, was to remove a DB18 & replace it with the original cabinet I had for it, a DB15 (don’t ask me why 🤮). I also had to relocate the plumbing holes in the SB36 floor (plumbing comes from the floor for mobile homes) and make patches for the slotted holes (I’ll take a picture of it tomorrow). Starting at about 10:30 am, I got it done finally at 2:30 pm.
Next, I realized that the DW was hard-wired with an 18″ cord, which isn’t a problem, unless you want to replace it. I guess it was installed 2 years ago by Home Depot. Don’t know HTF they did that without removing the countertop 😳???
Then I discovered that the countertop had some 1/4″ hardboard glued to the bottom (we are re-using the Formica post-formed tops). This became an issue with his wife.
They were going back & forth about these issues, so I thold them that they can discuss it all & I’ll go get materials for it. That was at 3 pm. But I still made it home before 5:30, so it was a GOOD DAY!!!
Today was a good day GIF
I forgot to mention that the DW was a short (24″) live-wired connection that got shorted out when I tried pulling it away from the wall & had to fix that so it wouldn’t happen again.
Prasher cabinet install Prescott Country Club in Dewey, Arizona mid-project 5-2-22